These generously sized circulation paths of ramps and landings overlook the fields inviting both passage and pause for all visitors to experience together.Ī new fully accessible 9,500 SF field house will be located in between Prevost and Encke Fields. Sitework improvements include extensive upgrades to Prevost and Encke Fields, the two main stadium facilities at the school, including new entrance plazas, ADA parking, turf and track replacement, new bleachers, and ADA walkways and ramps that are designed to be fully integrated into the overall design of the project. “The ADA Accessibility and Wellness Infrastructure Project at Radnor High School” addresses outdated and inaccessible athletic facilities at Radnor High School with a multi-prong approach including site improvements, new construction / additions, and major renovations of the existing high school.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |